Project Profiles

 Strip Out

Project Name

Description

Client

20 Bond Street

28 floor back to base strip out, including foyers, bathrooms, plant rooms, multiple penetrations, major structural modifications and strip out to ground floor lobby awning, interior and façade, plus external and retail tenancy works

Mirvac Constructions
Darling Park Tower 1 GF – L18 Sixteen floor back to base strip out, including foyers and bathrooms of low and mid rise floors Levels G – 18 plus stair and mechanical penetrations FDC Construction & Fitout
Darling Park Tower 1 Stage 1 Nine floor back to base strip out, including foyers and bathrooms of high rise floors Levels 19 – 27 plus stair and mechanical penetrations. FDC Construction & Fitout
Sports Theatre Star City Casino Back to base strip out and structural modifications for new Sports Theatre Buildcorp Interiors
50 Miller St North Sydney Ten floor back to base strip out, including foyers and bathrooms Premier Commercial Interiors
Governor Philip Tower Levels 23-25 Three floor back to base strip out of Levels 23 - 25, plus stair penetrations Akalan Projects
66 Clarence St Levels 1-6 Six floor back to base strip out, including bathrooms and foyers of Levels 1 – 6 Pro Management Group
431 Glebe Point Rd Two floor strip out and demolition of rooftop pool Lucas Projects
BT Tower 1 Market St Levels 8-11 Four floor back to base strip out, including bathrooms and foyers of Levels 8 – 11 TDA Interiors
Sydney Town Hall POPE Upgrade Strip out, structural modifications and penetrations to Levels 1 – 4 and Roof of the heritage-listed Sydney Town Hall for essential services upgrade. Kell & Rigby
Ferguson Centre Seven floor back to base strip out, including bathrooms and structural modifications to foyer and external areas Bovis Lend Lease
L14 & L15 Chifley Tower Two floor strip out of Levels 14 & 15 Interior 2
Jessie Street Centre (ATO) Multi level back to base strip out (over 20,000m2) including bathrooms and multiple large structural floor penetrations throughout entire building; demolition of entire lobby demolition covering over 1800m2. Cubic Projects

Structural

Project Name

Description

Client

Tooheys Brewery

Removal of pre-cast concrete tunnel walkways in operational brewery with very restricted access

CD Commercial
North Shore Private Hospital

Major structural modifications, including balcony and staircase removal, penetrations to link old building to new; works conducted while hospital operational, including adjacent theatres

Bovis Lend Lease
Alfords Point Bridge Saw cut and remove section of wall for access to new pier, scabbling of slab for new piers, demolition of redundant plinths, prop and support existing deck beam, disconnect plinth via wire sawing from existing deck beam, lift and load out, saw cut and hammer out drainage channels. Reed Constructions
68 Pitt Street

Major structural and façade works including removal of 8m glazing panels, marble and concrete from lobby; 340t brickwork removed from severely restricted access in basement

Watpac
Anvil Road Seven Hills

Demolition and site clean of fire damaged warehouse including removal of brick walls, metal roof structure with asbestos cement sheet roof cladding

Bovis Lend Lease
50 Holt St Surry Hills Structural modifications including complete removal of fire stairs and rooftop apartment SX Projects
Global Switch Verandah Structural modifications including balcony façade and floor removal Akalan Projects
Mollymook Golf Club Strip out and structural modifications including demolition of half the clubhouse Paynter Dixon Constructions
Sara Lee Gosford Factory coolroom demolition SMG Constructions
Cooleman Court Shopping centre strip out, structural modifications and asbestos removal CD Commercial
431 Glebe Point Rd Two floor strip out and demolition of rooftop pool Lucas Projects
Cranbrook Bowling Club Demolition of bowling club and site remediation Cranbrook School
Sydney Airport - Pier C works & AWD/QST T1 Terminal Slab removal and bulk excavation Leighton Contractors
33 Carter St Homebush Façade, stairwell, lift car and shaft removal plus stair penetrations Pro Management Group
Sydney Town Hall POPE Upgrade Strip out, structural modifications and penetrations to Levels 1 – 4 and Roof of the heritage-listed Sydney Town Hall for essential services upgrade. Kell & Rigby